跳到正文
arXiv cs.AI· Zhuojun Xie, Adam Abdin, Yiping Fang·· 4 小时前AI 评分25

数据驱动的维护优化:让预测性学习对齐维护决策目标

Data-Driven Maintenance Optimization: Aligning Prognostic Learning with Decision Objective

AI 导读

一项预测性维护研究提出集成估计-优化(IEO)框架,直接以维护成本为学习目标,取代传统“先估计后优化”(ETO)方法所依赖的 KL 散度或均方误差等替代指标。在 CMAPSS 四个子集实验中,IEO 将平均维护成本较 ETO 降低 14.8–22.7%,较决策导向基线降低 7.2–11.8%,同时降低故障率和成本波动,尽管其预测误差更高。

正文 · 原文

View PDF HTML (experimental)

Abstract:Estimation error in machine learning prognostic models can propagate into poor maintenance decisions. We study a data-driven predictive maintenance problem coupling health-condition estimation with a joint ordering-replacement model. We show that the conventional Estimate-Then-Optimize (ETO) approach yields inconsistent, suboptimal decisions for a broad class of such problems. To bridge the gap, we propose an Integrated Estimate-Optimize (IEO) framework that directly targets maintenance cost as the prognostic learning objective, bypassing surrogate statistical accuracy metrics such as Kullback--Leibler divergence or mean squared error. Theoretically, we prove out-of-sample performance guarantees of the IEO framework under certain conditions, including i.i.d. and sliding-window data-generating processes. Computationally, we develop a training procedure combining Monte Carlo dropout, central-difference gradient approximation, and an ETO warm-start to handle discrete maintenance decisions and nonlinear costs. Experiments on the four CMAPSS subsets demonstrate that, under the nominal setting, IEO reduces mean maintenance cost by 14.8--22.7% relative to ETO and by 7.2--11.8% relative to a decision-oriented baseline, while also reducing failure rates and cost variation. These improvements are obtained despite higher prediction errors. Increasing the ratio of unplanned-downtime costs to planned-downtime costs makes this tradeoff more pronounced: IEO shifts predictions further toward RUL underestimation, accompanied by greater cost savings and fewer failures. These findings support aligning prognostic learning with maintenance objectives when imperfect predictions must guide decisions under costly unplanned downtime.
Subjects: Artificial Intelligence (cs.AI); Optimization and Control (math.OC)
Cite as: arXiv:2506.19698 [cs.AI]
  (or arXiv:2506.19698v2 [cs.AI] for this version)
  https://doi.org/10.48550/arXiv.2506.19698

arXiv-issued DOI via DataCite

Submission history

From: Zhuojun Xie [view email]
[v1] Tue, 24 Jun 2025 15:10:15 UTC (588 KB)
[v2] Mon, 26 Oct 2026 19:57:27 UTC (457 KB)

来源:arXiv cs.AI · arxiv.org